What utilities are notified?
UDIG notifies the current members of the UDIG parent organization
that have buried facilities in your excavation area. It the responsibility
of each utility or member to mark and/or communicate this information
to you within 2 business days. Practice in the UDIG territory has
been for the locator to paint marks on the ground either to mark buried
facilities or to note "No Gas", "No Power", etc. Marks will be made
using the Standard APWA paint color for each respective utility. The
paint colors are as follows:
Color Codes
For Marking Underground Utility Lines |
Red |
Electric |
Blue |
Water |
Yellow |
Gas - Oil - Steam |
Green |
Sewer |
Orange |
Communication CATV |
Pink |
Temporary Survey
Markings |
White |
Proposed Excavation |
|
|
Remember:
- Utilities have two business days after receiving notification
to mark their buried facilities.
- Multiple line locators will come to the digging site. Just because
you have seen one mark on the ground doesn't necessarily mean that
all utilities have been located.
- If you are unsure if all utilities representatives have been to
the site, CALL UDIG.
- All UDIG calls are tape recorded. The locate requests are transmitted
by FAX to members with a FAX capability. Other members are contacted
by phone. Montana One Call operates 7 days per week, 24 hours per
day. Emergency locates are transmitted to members by phone as soon
as they are received.
- UDIG members are required to provide Montana One Call with maps
of their service territory. These are not detailed facility maps,
but rather geographic maps showing boundaries of their underground
facilities, with road names, streets etc.
- UDIG and Montana One Call do not actually perform locates.
This responsibility rests with the utilities and members.
|
Home
Notification
Membership
Coverage
Map
Montana
Code
Fax-A-Locate
FAQ
|